Western Fisheries Research Center

Multimedia

Search here for some of our available field imagery and videos.

Filter Total Items: 366
August 13, 2013

D1 East Transect – 2013

Permanent Site: D1 East Transect; Depth: 1.5 Meters (5 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15115998,-123.56734404; Site Description: This site is right off the mouth of the river and is actively being buried. This was the last year the site could be scuba surveyed. The depth on this

August 13, 2013

D1 West Transect – 2013

Permanent Site: D1 West Transect; Depth: 5.9 Meters (19.5 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15115998,-123.56801602; Site Description: This site is right off the mouth of the river and is actively being buried. This was the last year the site could be scuba surveyed. Depth on this

August 13, 2013

C2 East Transect – 2013

Permanent Site: C2 East Transect; Depth: 15.9 Meters (Feet 52.2); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Featherduster tubeworms, mainly Eudistylia vancouveri (0:35 seconds) and

August 13, 2013

E2 West Transect – 2013

Permanent Site: E2 West Transect; Depth: 14.8 Meters (48.4 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders. Seaweed is absent. The one frond seen on video at 0:

August 13, 2013

4SP1 West Transect – 2013

Permanent Site: 4SP1 - West Transect; Depth: 6.2 Meters (20.5 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: The former gravel/cobble substrate has almost been completely buried in sand. Between 0:29 – 0:37 seconds a small section of the former gravel/

August 13, 2013

C2 West Transect – 2013

Permanent Site: C2 West Transect; Depth: 16.8 Meters (Feet 55.1); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Featherduster tubeworms, mainly Eudistylia vancouveri (1:13, 1:29, 1:40 seconds

August 12, 2013

F1 West Transect – 2013

Permanent Site: F1 West Transect; Depth: 6.5 Meters (21.2 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This is a shallow site with gravel/cobble substrate and an occasional boulder. Woody debris is present (0:14, 0:24seconds). Algae is gone except

August 12, 2013

A1 West Transect – 2013

Permanent Site: A1 West Transect; Depth: 8.5 Meters (28.0 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds are absent this year. Feather

August 12, 2013

F1 East Transect – 2013

Permanent Site: F1 East Transect; Depth: 6.3 Meters (20.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site with gravel/cobble substrate. Woody debris is present (0:16, 0:38 seconds). Algae is gone except for the dead stalks of the

August 12, 2013

A1 East Transect – 2013

Permanent Site: A1 East Transect; Depth: 7.9 Meters (25.9 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with an occasional boulder. Seaweeds are very sparse this year

August 1, 2013

C1 West Transect – 2013

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is scattered along entire transect (0:21 0:34, 0:59 seconds). Invertebrates are scarce with the

July 31, 2013

F2 West Transect – 2013

Permanent Site: F2 West Transect; Depth: 12.3 Meters (40.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder. Only remaining seaweeds are the dead stalks of the perennial