Western Fisheries Research Center
Multimedia
Search here for some of our available field imagery and videos.
A2 East Transect – 2013
Permanent Site: A2 East Transect; Depth: 12.8 Meters (Feet 42); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Seaweeds are absent this year. Woody debris is seen on transect for the
H1 East Transect – 2014
Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites. Substrate is still
Collecting Benthic Invertebrates
USGS scientists, Steve Rubin and Karl Stenberg, collecting samples to determine the distribution of benthic invertebrates in the Skagit River delta during an extreme low-tide. Information on the distribution and abundance of invertebrates will help resource managers better understand how fish, such as Chinook salmon use the delta.
Sample bottles from pump sampler on the Elwha River
Sample bottle carousel from automated ISCO pump sampler deployed on the Elwha River, Washington to obtain suspended sediment samples.
Southwestern Willow Flycatcher habitat along the Upper Gila River, AZ.
Southwestern Willow Flycatcher habitat along the Upper Gila River, Arizona.
L1 West Transect – 2012
Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.6 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
L1 East Transect – 2012
Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
K1 East Transect – 2012
Permanent Site: K1 East Transect; Depth: 6.5 Meters (21.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
H2 West Transect – 2012
Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth. Substrate is mainly gravel with some sand, cobble and an occasional boulder and has not changed since dam
K1 West Transect – 2012
Permanent Site: K1 West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
Dendronotid nudibranch on hydroids
Dendronotid nudibranch on hydroids - Scuba divers from the U.S. Geological Survey’s Western Fisheries Research Center, Washington Sea Grant, EPA and the Lower Elwha Klallam Tribe collected data and images from a long-term study of the Elwha River dam removals and the resulting effects on the nearshore ecosystem.
Location: Strait of
...D2 East Transect – 2012
Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweeds are now mostly gone except for the perennial