August 2, 2017

A1 West Transect – 2017

Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.7 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. The sandy areas on the entire transect

August 1, 2017

K1 East Transect – 2017

Permanent Site: K1 East Transect; Depth: 6.2 Meters (20.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture. Both red (1:29 seconds) and brown seaweed was abundant but this year browns were

August 1, 2017

K1 West Transect – 2017

Permanent Site: K1 West Transect; Depth: 5.5 Meters (18.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture. Both red (0:20, 0:25 seconds) and brown seaweed was abundant with the browns more

August 1, 2017

F2 West Transect – 2017

Permanent Site: F2 West Transect; Depth: 11.1 Meters (36.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly a gravel/cobble mixture with an occasional boulder. Seven species of brown seaweed were present. Seaweed was abundant but not

July 31, 2017

H1 East Transect – July 2017

Permanent Site: H1 East Transect; Depth: 5.2 Meters (16.9 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites. Substrate remains mainly

July 31, 2017

H1 West Transect – 2017

Permanent Site: H1 West Transect; Depth: 5.4 Meters (17.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites. Substrate remains

July 31, 2017

E2 East Transect – 2017

Permanent Site: E2 East Transect; Depth: 15.1 Meters (49.4 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: Video is only of the last 10 meters of the transect. This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder

July 31, 2017

E2 West Transect – 2017

Permanent Site: E2 West Transect; Depth: 14.6 Meters (47.9 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders. Only a few small brown seaweeds were present (acid

July 30, 2017

D2 East Transect – 2017

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. In 2016 it was actively being buried in sand but this year the substrate was returning to mainly gravel

July 30, 2017

D2 West Transect – 2017

Permanent Site: D2 West Transect; Depth: 12.3 Meters (40.3 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 6 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. In previous years the substrate has been mainly gravel with some cobble and about 10% sand but this year

July 30, 2017

L1 East Transect – 2017

Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:05 seconds). Scattered boulders

July 30, 2017

L1 West Transect – 2017

Permanent Site: L1 West Transect; Depth: 10.9 Meters (35.7 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:52, 1:12 seconds). Where there are no boulders, substrate is