New Thompson Bridge

Detailed Description
August 31, 2010 - Construction of the new bridge. Streamflow was 2,770 cfs and gage height was 20.31 ft.
August 31, 2010 - Construction of the new bridge. Streamflow was 2,770 cfs and gage height was 20.31 ft.