Skip to main content
U.S. flag

An official website of the United States government

A mass-balance approach for assessing PCB movement during remediation of a PCB-contaminated deposit on the Fox River, Wisconsin

January 1, 2000

The U.S. Geological Survey, in cooperation with the Wisconsin Department of Natural Resources, collected water samples during the September 1 - December 15, 1999 removal of sediment contaminated with polychlorinated biphenyls (PCBs) from a reach of the Lower Fox River designated Sediment Management Unit (SMU) 56/57. Results of analyses of the samples, along with monitoring activities of several other organizations, were used to delineate and compare PCB mass pathways during the cleanup effort (fig. 1). Results indicate that the cleanup at SMU 56/57 had the following effect on PCB mass: dredging permanently removed more than 650 kg (1441 lb) of PCBs, transported 14.5 kg (32 lb) downstream, and volatilized 2.6 kg (5.7 lb) to the atmosphere; associated activities on the shore returned 0.1 kg (0.3 lb) to the river. This report documents the USGS data-collection efforts and details the mass-balance approach for PCB pathway delineation.

Publication Year 2000
Title A mass-balance approach for assessing PCB movement during remediation of a PCB-contaminated deposit on the Fox River, Wisconsin
DOI 10.3133/wri004245
Authors Jeffrey J. Steuer
Publication Type Report
Publication Subtype USGS Numbered Series
Series Title Water-Resources Investigations Report
Series Number 2000-4245
Index ID wri004245
Record Source USGS Publications Warehouse
USGS Organization Wisconsin Water Science Center