Breakouts remain active upslope of stalled flow front
Detailed Description
Although the leading tip of the June 27th flow remains stalled, breakouts continue to be active upslope. This breakout was active about 400 meters (0.25 miles) upslope of Cemetery Road / AP‘A‘ā Street.