Fissure 8 braided channel the braided section is flowing, but some abandoned c
Detailed Description
Fissure 8 braided channel the braided section is flowing, but some abandoned connector channels were more obvious today in the sunlight than on previous days. The braid that got blocked on Monday still looks like its struggling, but it also looks more stable than on wed.
Sources/Usage
Public Domain.