4SP1 East Transect - 2010

Download Video
Right-click and save to download

Detailed Description

Permant Site: 4SP1 - East Transect Depth: 6.0 Meters (19.8 Feet) Distance from river mouth: 0.8 Kilometers (0.5 Miles) East Pre/Post Dam Removal: 1 Year Pre-dam removal Lat/Long: 48.15257, -123.556704 Site Description: Predominantly a shallow, high current site with cobble and gravel substrate covered in seaweed.

Details

Date Taken:

Length: 00:01:32

Location Taken: Elway River, WA, US

Video Credits

Editor: Chloe Dawson

Source:

Transcript

N/A