The U.S. Soil Conservation Service is actively engaged in the installation of flood and soil erosion reducing measures in Texas under the authority of "The Flood Control Act ot 1936 and 1944" and ''Watershed Protection and Flood Prevention Act" (Public Law 566), as amended. In June 1968, the Soil Conservation Service estimated approximately 3,500 structures to be physically and economically feasible for installation in Texas. As of September 30, 1968, 1,271 of these structures had been built.
This watershed-development program will have varying but important effects on the surface- and ground-water resources of river basins, especially where a large number of the floodwater-retarding structures are built. Basic hydrologic data are needed to appraise the effects of the structures on water yield and the mode of occurrence of runoff.
Hydrologic investigations of these small watersheds were begun by the Geological Survey in 1951 and are now being made in 11 areas (fig. 1). These studies are being made in cooperation with t he Texas Water Development Board, the Soil Conservation Service, the San Antonio River Authority, the city of Dallas, and the Tarrant County Water Control and Improvement District No. 1. The 11 study areas were choson to sample watersheds having different rainfall, topography, geology, and soils. In four of the study areas (Mukewater, North, Little Elm, and Pin Oak Creeks), streamflow and rainfall records were collected prior to construction of the floodwater-retarding structures, thus affording the opportunity for analyses to the conditions before and after" development. Structures have now been built in three of these study areas. A summary of the development of the floodwater-retarding structures on each study area as of September 30, 1968, is shown in table 1.