This investigation was made to determine the surface and subsurface geological conditions along the proposed relocation of Route 138 in the vicinity of the Torrey Street crossing in Brockton, Mass. The field work was done in April 1952 as part of cooperative program of the Commonwealth of Massachusetts, Department of Public Works, and the United States Department of the Interior, Geological Survey.