The layout for the reconstruction of the Newburyport Turnpike (Route 1) proposed cit at stations 127-135, in Danvers, Mass., shows a deep cut through the western end of a hill between stations 127 and 135. Because of the depth of this cut seismic work was done at the site in September 1949. The work constitutes part of the cooperative program of the Department of Public Works and the United States Geological Survey.