Geologic interpretations of seismic data Route 128 (Northern Circumferential Highway) cut, and Hopkins Street grade separation stations 1-18 in Wakefield, Mass.

January 1, 1950

The completion of a segment of the Northern Circumferential Highway, Route 126, in Wakefield, Mass., requires an underpass bridge at Hopkins Street, Station 5+50. The plan of the project shows approximately 1800 feet if approach cuts between stations 1 and 18. In October 1945 a preliminary seismic study was made of a segment of this cut between stations 6+50 and 13+30. Four profiles were made at this time and a report was submitted by Newton E. Chute and Rev. Daniel Linhan (file report of January 15). This work showed a relatively shallow (in general, 6 to 12 feet in depth) somewhat irregular bedrock surface between stations 6+50 and 13+50. That data indicated that much of this segment of the cut will be in bedrock. In order to obtain more complete data for the preparation of detailed estimates on the amount of bedrock to be excavated for this segment of the cut, and also to obtain sufficient data for the unexplored segment of the cut, 21 additional seismic traverses were made in September 1949. The present report contains only the results obtained from this later work.


The work was performed as a part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey.

Publication Year 1950
Title Geologic interpretations of seismic data Route 128 (Northern Circumferential Highway) cut, and Hopkins Street grade separation stations 1-18 in Wakefield, Mass.
DOI 10.3133/ofr5043A
Authors James E. May, Rev. Daniel Lineham
Publication Type Report
Publication Subtype USGS Numbered Series
Series Title Open-File Report
Series Number 50-43
Index ID ofr5043A
Record Source USGS Publications Warehouse