Geologic and seismic studies were made at this site for the purpose of obtaining data that would aid in determining the kinds of material underlying the site, and estimating the amounts of these materials to be excavated. The work was done in May 1952 as part of a cooperative program of the Massachusetts Department of Public Works and the Interior States Geological Survey.