The author provides a brief description of the geology along the route for each day of the ride, from June 14 through June 19, 2009. Ride the Rockies begins and ends in Glenwood Springs, with stops in Hotchkiss, Gunnison, Salida, Leadville, Aspen, and back to Glenwood Springs, Colorado. A small, generalized geologic map also is shown.