This portion of the Cache Creek-Little Granite Creek EIS Data Gathering and Evaluation Study had two central objectives.
The first was to review all land access possibilities to the NCRA Cache Creek and to the Getty-Reserve Little Granite Creek proposed drilling sites. Based on this review, the preferred access corridor to each site was selected.
The second objective was to perform a reconnaissance survey of a feasible route within the selected corridor. Soils and design data were collected for the development of cost estimates and for use in studies being performed by other disciplines.