The failure potential of the debris-avalanche dam at Castle Lake near Mount St. Helens, Washington, by three processes of seepage erosion (1) Heave; (2) piping; and (3) internal erosion, is examined. Results indicated that the dam is stable against piping but potentially locally unstable against heave. -from Authors