This memorandum summarize information brought out in correspondence between the office of the District Engineer of the Milwaukee District, U.S. Corps of Engineers, and the District Office of the Ground Water Branch of the U.S. Geological Survey at Lansing, Mich., concerning the probable effects on the ground-water resources of the Lansing area from the construction of a proposed flood-water cut-off channel for the Grand River to extend from Millett to Delta Mills, in Eaton County, Mich.