New Thompson Bridge

Detailed Description
April 19, 2010 - Construction of the new bridge. Gage height was 32.56 ft and streamflow was 11,200 cfs.
April 19, 2010 - Construction of the new bridge. Gage height was 32.56 ft and streamflow was 11,200 cfs.