Pilchuck Dam, July 10, 2020
Detailed Description
Pilchuck Dam, July 10, 2020
Sources/Usage
Public Domain.
Related Content
Channel change monitoring following the Pilchuck Dam removal
The issue: In the summer of 2020, the Pilchuck Dam will be removed, allowing salmon access to the upper third of the Pilchuck River watershed for the first time in over a century. This removal will be associated with a short period increased sediment delivery, as the river re-works material trapped behind the dam. While the volume of impounded sediment is small and major changes in the downstream...
Related Content
Channel change monitoring following the Pilchuck Dam removal
The issue: In the summer of 2020, the Pilchuck Dam will be removed, allowing salmon access to the upper third of the Pilchuck River watershed for the first time in over a century. This removal will be associated with a short period increased sediment delivery, as the river re-works material trapped behind the dam. While the volume of impounded sediment is small and major changes in the downstream...