New Thompson Bridge
Detailed Description
September 27, 2010 - Construction on the new bridge. Gage height was 33.50 ft and streamflow was 11,200 cfs.
September 27, 2010 - Construction on the new bridge. Gage height was 33.50 ft and streamflow was 11,200 cfs.