Overview of production test site (June 2023)

Detailed Description

The installation of wells, which included two monitoring wells and two production wells, was completed on February 28, 2023, and test operations began on October 24, 2023.

In preparation for the production test, a stratigraphic test well (STW) and a geo-data well (GDW) were drilled in 2018 and 2022 respectively. These wells were used to confirm the geologic conditions at the site through acquisition of well log and pressure coring, and they were subsequently converted into monitoring wells.  