Ecoflume time lapse construction video
Detailed Description
A team of engineers from the University of Minnesota, Saint Anthony Falls Laboratory installing the Ecoflume in a laboratory at the USGS, Columbia Environmental Research Center. One turning end and the two straight flume sections were moved into place first, followed by paddlewheel stands, and finally the second turning end. All four flume sections were placed on blocking, bolted and glued together, and carefully lowered and leveled onto rubber skirtboard that was used to level the flume
Details
Sources/Usage
Public Domain.