Skip to main content
U.S. flag

An official website of the United States government

Geologic and seismic investigation for relocation of Route 138, Brockton-Avon town line, prospective cut, stations 193+00 in Brockton to 8+00 in Avon, Mass.

January 1, 1954

This work was done to obtain information that would aid in establishing a grade for this segment of Route 138, and would also be of value in determining the kinds and quantities of materials to be excavated from the prospective cut at this site. The work was performed in August 1952 as part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey.

Publication Year 1954
Title Geologic and seismic investigation for relocation of Route 138, Brockton-Avon town line, prospective cut, stations 193+00 in Brockton to 8+00 in Avon, Mass.
DOI 10.3133/ofr54198
Authors James E. May, Raymond Miller
Publication Type Report
Publication Subtype USGS Numbered Series
Series Title Open-File Report
Series Number 54-198
Index ID ofr54198
Record Source USGS Publications Warehouse