Skip to main content
U.S. flag

An official website of the United States government

Transport of dissolved and suspended material by the Potomac River at Chain Bridge, at Washington, D.C., water years 1978-81

January 1, 1987

The measuring station Potomac River at Chain Bridge at Washington, D.C., is located at the upstream end of the tidal Potomac River. Water-quality data were collected intensively at this site from December 1977 through September 1981 as part of a study of the tidal Potomac River and Estuary. Analysis of water-discharge data from the long-term gage at Little Falls, just up stream from Chain Bridge, shows that streamflow for the 1979-81 water years had characteristics similar to the 51-year average discharge (1931-81). Loads were computed for various forms of phosphorus and nitrogen, major cations and anions, silica, biochemical oxygen demand, chlorophyll a and pheophytin, and suspended sediment.

Load duration curves for the 1979-81 water years show that 50 percent of the time, water passing Chain Bridge carried at least 28 metric tons per day of total nitrogen, 1.0 metric tons per day of total phosphorus, 70 metric tons per day of silica, and 270 metric tons per day of suspended sediment. No consistent seasonal change in constituent concentrations was observed; however, a seasonal trend in loads due to seasonal changes in runoff was noted. Some storm runoff events transported as much dissolved and suspended material as is transported during an entire low-flow year.

Publication Year 1987
Title Transport of dissolved and suspended material by the Potomac River at Chain Bridge, at Washington, D.C., water years 1978-81
DOI 10.3133/wsp2234B
Authors Stephen F. Blanchard, D. C. Hahl
Publication Type Report
Publication Subtype USGS Numbered Series
Series Title Water Supply Paper
Series Number 2234
Index ID wsp2234B
Record Source USGS Publications Warehouse
Was this page helpful?