6PPD-Q monitoring site installation
By Oregon Water Science Center
September 2025 (approx.)
Detailed Description
USGS field crew bends a pipe during the installation of a 6 PPD-Q monitoring system. The pipe will reach down into the storm drain to enable sample collection.
Sources/Usage
Public Domain.