The issue: In the summer of 2020, the Pilchuck Dam will be removed, allowing salmon access to the upper third of the Pilchuck River watershed for the first time in over a century. This removal will be associated with a short period increased sediment delivery, as the river re-works material trapped behind the dam. While the volume of impounded sediment is small and major changes in the downstream...