Skip to main content
U.S. flag

An official website of the United States government

Videos

Explore a diverse collection of engaging videos showcasing the latest research, discoveries, and educational content from the U.S. Geological Survey. Dive into the fascinating world of geology, hydrology, ecology, and natural hazards as we bring science to life. Stay informed and inspired by our visual storytelling that highlights the vital work of USGS scientists and their impact on the planet.

Filter Total Items: 2894
video thumbnail: Time-Lapse Video of the Platte River at South Bend (Lied Bridge NE) video thumbnail: Time-Lapse Video of the Platte River at South Bend (Lied Bridge NE)
Time-Lapse Video of the Platte River at South Bend (Lied Bridge NE)
Time-Lapse Video of the Platte River at South Bend (Lied Bridge NE)

Time-lapse photos taken from the northeast side of the Lied Bridge on the Platte River at South Bend near streamflow-gaging station 06805500. Photos taken every hour from April 14, 2011 to Aug. 6, 2012.

Time-lapse photos taken from the northeast side of the Lied Bridge on the Platte River at South Bend near streamflow-gaging station 06805500. Photos taken every hour from April 14, 2011 to Aug. 6, 2012.

video thumbnail: Time-Lapse Video of the Platte River at Two Rivers State Park video thumbnail: Time-Lapse Video of the Platte River at Two Rivers State Park
Time-Lapse Video of the Platte River at Two Rivers State Park
Time-Lapse Video of the Platte River at Two Rivers State Park

Time-lapse photos taken from the a camera on the upstream side of abandoned concrete bridge piers facing north toward State Highway 92 from June 1 to Aug. 6, 2012.

Time-lapse photos taken from the a camera on the upstream side of abandoned concrete bridge piers facing north toward State Highway 92 from June 1 to Aug. 6, 2012.

video thumbnail: Puget Sound Groundwater Sampling Time Lapse video thumbnail: Puget Sound Groundwater Sampling Time Lapse
Puget Sound Groundwater Sampling Time Lapse
Puget Sound Groundwater Sampling Time Lapse

This time-lapse is shot on the Hood Canal Wa., over the course of a typical groundwater sampling field day. We were investigating the impacts of a macrotidal tide range on the geochemistry of submarine groundwater discharge.

This time-lapse is shot on the Hood Canal Wa., over the course of a typical groundwater sampling field day. We were investigating the impacts of a macrotidal tide range on the geochemistry of submarine groundwater discharge.

video thumbnail: The Anatomy of Floods: The Causes and Development of 2011's Epic Flood Events video thumbnail: The Anatomy of Floods: The Causes and Development of 2011's Epic Flood Events
The Anatomy of Floods: The Causes and Development of 2011's Epic Flood Events
The Anatomy of Floods: The Causes and Development of 2011's Epic Flood Events

Flooding costs the United States more than $7 billion per year and claims more than 90 lives annually. During the Spring and Summer of 2011, the central U.S. experienced epic flooding, while Hurricane Irene followed by Tropical Storm Lee caused severe flooding in the east and northeastern U.S, setting numerous flood records at USGS streamgages. Dr.

Flooding costs the United States more than $7 billion per year and claims more than 90 lives annually. During the Spring and Summer of 2011, the central U.S. experienced epic flooding, while Hurricane Irene followed by Tropical Storm Lee caused severe flooding in the east and northeastern U.S, setting numerous flood records at USGS streamgages. Dr.

Volcano Hazards
Volcano Hazards
Volcano Hazards

The United States has 169 active volcanoes. More than half of them could erupt explosively, sending ash up to 20,000 or 30,000 feet where commercial air traffic flies. USGS scientists are working to improve our understanding of volcano hazards to help protect communities and reduce the risks.

Video Sections:

The United States has 169 active volcanoes. More than half of them could erupt explosively, sending ash up to 20,000 or 30,000 feet where commercial air traffic flies. USGS scientists are working to improve our understanding of volcano hazards to help protect communities and reduce the risks.

Video Sections:

C1 East Transect – 2012
C1 East Transect – 2012
C1 East Transect – 2012

Permanent Site: C1 East Transect; Depth: 8.8 Meters (Feet 28.8); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Brown seaweeds are absent and only a few small red seaweeds remain (1:13, 2:31 seconds).

Permanent Site: C1 East Transect; Depth: 8.8 Meters (Feet 28.8); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Brown seaweeds are absent and only a few small red seaweeds remain (1:13, 2:31 seconds).

H1 East Transect – 2012
H1 East Transect – 2012
H1 East Transect – 2012

Permanent Site: H1 East Transect; Depth: 5.6 Meters (Feet 18.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.6 Meters (Feet 18.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 West Transect – 2012
H1 West Transect – 2012
H1 West Transect – 2012

Permanent Site: H1 West Transect; Depth: 5.0 Meters (Feet 16.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.0 Meters (Feet 16.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

C2 East Transect – 2012
C2 East Transect – 2012
C2 East Transect – 2012

Permanent Site: C2 East Transect; Depth: 16.1 Meters (Feet 52.7); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is now entirely all sand. Algae is almost gone. A few reds are seen at 0:48, 1:04, 1:49 seconds.

Permanent Site: C2 East Transect; Depth: 16.1 Meters (Feet 52.7); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is now entirely all sand. Algae is almost gone. A few reds are seen at 0:48, 1:04, 1:49 seconds.

F1 East Transect – 2012
F1 East Transect – 2012
F1 East Transect – 2012

Permanent Site: F1 East Transect; Depth: 6.2 Meters (20.4 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site with gravel/cobble substrate.

Permanent Site: F1 East Transect; Depth: 6.2 Meters (20.4 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site with gravel/cobble substrate.

F1 West Transect – 2012
F1 West Transect – 2012
F1 West Transect – 2012

Permanent Site: F1 West Transect; Depth: 9.7 Meters (32 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This is a shallow site with gravel/cobble substrate and an occasional boulder.

Permanent Site: F1 West Transect; Depth: 9.7 Meters (32 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This is a shallow site with gravel/cobble substrate and an occasional boulder.

C2 West Transect – 2012
C2 West Transect – 2012
C2 West Transect – 2012

Permanent Site: C2 West Transect; Depth: 17 Meters (Feet 55.7); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is now entirely all sand. Algae is almost gone.

Permanent Site: C2 West Transect; Depth: 17 Meters (Feet 55.7); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is now entirely all sand. Algae is almost gone.

PubTalk 7/2012 — Wind Energy and Wildlife
PubTalk 7/2012 — Wind Energy and Wildlife
PubTalk 7/2012 — Wind Energy and Wildlife

-- the challenges of wind-energy development and wildlife conservation

by Manuela Huso, Research Statistician

 

A1 East Transect – 2012
A1 East Transect – 2012
A1 East Transect – 2012

Permanent Site: A1 East Transect; Depth: 8.4 Meters (27.5 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with an occasional boulder. Seaweeds are sparse.

Permanent Site: A1 East Transect; Depth: 8.4 Meters (27.5 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with an occasional boulder. Seaweeds are sparse.

A1 West Transect – 2012
A1 West Transect – 2012
A1 West Transect – 2012

Permanent Site: A1 West Transect; Depth: 8.4 Meters (27.7 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders.

Permanent Site: A1 West Transect; Depth: 8.4 Meters (27.7 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders.

D1 East Transect – 2012
D1 East Transect – 2012
D1 East Transect – 2012

Permanent Site: D1 East Transect; Depth: 10.0 Meters (32.8 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15115998,-123.56734404; Site Description: This site is right off the mouth of the river. Substrate is still mainly gravel with some sand. All annual species of seaweeds are gone.

Permanent Site: D1 East Transect; Depth: 10.0 Meters (32.8 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15115998,-123.56734404; Site Description: This site is right off the mouth of the river. Substrate is still mainly gravel with some sand. All annual species of seaweeds are gone.

D1 West Transect – 2012
D1 West Transect – 2012
D1 West Transect – 2012

Permanent Site: D1 West Transect; Depth: 10.3 Meters (33.8 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15115998,-123.56801602; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.

Permanent Site: D1 West Transect; Depth: 10.3 Meters (33.8 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15115998,-123.56801602; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.

A2 West Transect – 2012
A2 West Transect – 2012
A2 West Transect – 2012

Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.2); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with a few scattered boulders.

Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.2); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with a few scattered boulders.

Tracking Pacific Walrus Trailer

This fast paced, one minute trailer, promotes the award winning USGS video ‘Tracking Pacific Walrus’

This fast paced, one minute trailer, promotes the award winning USGS video ‘Tracking Pacific Walrus’

Tracking Pacific Walrus: Expedition to the Shrinking Chukchi Sea Ice
Tracking Pacific Walrus: Expedition to the Shrinking Chukchi Sea Ice
Tracking Pacific Walrus: Expedition to the Shrinking Chukchi Sea Ice

Summer ice retreat in the Chukchi Sea between Alaska and Russia is a significant climate change impact affecting Pacific Walruses, which are being considered for listing as a threatened species. This twelve minute video follows walruses in their summer sea ice habitat and shows how USGS biologists use satellite radio tags to track their movements and behavior.

Summer ice retreat in the Chukchi Sea between Alaska and Russia is a significant climate change impact affecting Pacific Walruses, which are being considered for listing as a threatened species. This twelve minute video follows walruses in their summer sea ice habitat and shows how USGS biologists use satellite radio tags to track their movements and behavior.

Walrus Radio Tagging 2012,B-roll, Reel 1A

Footage of Pacific Walrus, Sea ice, Scientists Tagging Walruses With Radio Tags, Tracking animation.

Footage of Pacific Walrus, Sea ice, Scientists Tagging Walruses With Radio Tags, Tracking animation.

Was this page helpful?