Geophysical data collected within and adjacent to the Little Wind River near Riverton, Wyoming
January 28, 2019
This data release contains geophysical data collected at the Little Wind River site near Riverton, Wyoming in 2015 and 2017. The dataset contains:[1] Fiber Optic Distributed Temperature Sensing data (FO-DTS, August-September 2015) collected in the water along the river bank, [2] Electrical Resistivity Tomography data (ERT, August 2017) collected on land near the river bank, and [3] Frequency domain Electromagnetic Induction (EMI, August 2017) data collected along the river and more extensively throughout the study region. Data for each of these methods can be found in the child items linked below.
Citation Information
Publication Year | 2019 |
---|---|
Title | Geophysical data collected within and adjacent to the Little Wind River near Riverton, Wyoming |
DOI | 10.5066/P9J9VJBR |
Authors | Neil C Terry, Martin Briggs |
Product Type | Data Release |
Record Source | USGS Asset Identifier Service (AIS) |
USGS Organization | Water Resources Mission Area - Headquarters |
Rights | This work is marked with CC0 1.0 Universal |
Related
Interaction of a legacy groundwater contaminant plume with the Little Wind River from 2015 through 2017, Riverton Processing site, Wyoming
The Riverton Processing site was a uranium mill 4 kilometers southwest of Riverton, Wyoming, that prepared uranium ore for nuclear reactors and weapons from 1958 to 1963. The U.S. Department of Energy completed surface remediation of the uranium tailings in 1989; however, groundwater below and downgradient from the tailings site and nearby Little Wind River was not remediated. Beginning in 2010, a
Authors
David L. Naftz, Christopher C. Fuller, Robert L. Runkel, John Solder, W. Payton Gardner, Neil Terry, Martin A. Briggs, Terry M. Short, Daniel J. Cain, William L Dam, Patrick A. Byrne, James R. Campbell
Related
Interaction of a legacy groundwater contaminant plume with the Little Wind River from 2015 through 2017, Riverton Processing site, Wyoming
The Riverton Processing site was a uranium mill 4 kilometers southwest of Riverton, Wyoming, that prepared uranium ore for nuclear reactors and weapons from 1958 to 1963. The U.S. Department of Energy completed surface remediation of the uranium tailings in 1989; however, groundwater below and downgradient from the tailings site and nearby Little Wind River was not remediated. Beginning in 2010, a
Authors
David L. Naftz, Christopher C. Fuller, Robert L. Runkel, John Solder, W. Payton Gardner, Neil Terry, Martin A. Briggs, Terry M. Short, Daniel J. Cain, William L Dam, Patrick A. Byrne, James R. Campbell