Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.
Videos
See our science in action.
Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.
Permanent Site: 4SP1 - West Transect; Depth: 6.3 Meters (20.8 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 11 months post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: Substrate has remained the same (gravel/cobble) but site is largely devoid of all annual species of seaweeds.
Permanent Site: 4SP1 - West Transect; Depth: 6.3 Meters (20.8 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 11 months post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: Substrate has remained the same (gravel/cobble) but site is largely devoid of all annual species of seaweeds.
video thumbnail: Return of the Gentle Giants: Huron-Erie Corridor Fish Habitat Restoration
Return of the Gentle Giants: Huron-Erie Corridor Fish Habitat Restoration
Return of the Gentle Giants: Huron-Erie Corridor Fish Habitat RestorationThe St. Clair River, Lake St. Clair and the Detroit River, also known as the Huron-Erie Corridor, are the international waters that connect Lake Huron to Lake Erie. Environmental changes in the Corridor over time have resulted in a loss of habitat for fish and other organisms. This video is focusing on the successful St.
Return of the Gentle Giants: Huron-Erie Corridor Fish Habitat Restoration
Return of the Gentle Giants: Huron-Erie Corridor Fish Habitat RestorationThe St. Clair River, Lake St. Clair and the Detroit River, also known as the Huron-Erie Corridor, are the international waters that connect Lake Huron to Lake Erie. Environmental changes in the Corridor over time have resulted in a loss of habitat for fish and other organisms. This video is focusing on the successful St.
Permanent Site: J1 West Transect; Depth: 9.1 Meters (29.9 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
Permanent Site: J1 West Transect; Depth: 9.1 Meters (29.9 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
This clip shows a bat (not identified to species) flying near a turbine as imaged with a camera sensitive to near infrared light. The bat flies in rapidly from the top left, then turns and flies into the spinning rotor blades of the turbine. The bat appears to be deflected upwards by the blades and escapes a direct strike.
This clip shows a bat (not identified to species) flying near a turbine as imaged with a camera sensitive to near infrared light. The bat flies in rapidly from the top left, then turns and flies into the spinning rotor blades of the turbine. The bat appears to be deflected upwards by the blades and escapes a direct strike.
Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t
Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t
Heather Welch, Claire Rose, and Richard Coupe, U.S. Geological Survey scientists involved in the National Water Quality Assessment (NAWQA) Study of Agricultural Chemical Transport (ACT) study, outline agricultural effects on water quality in the Mississippi Delta region.
Heather Welch, Claire Rose, and Richard Coupe, U.S. Geological Survey scientists involved in the National Water Quality Assessment (NAWQA) Study of Agricultural Chemical Transport (ACT) study, outline agricultural effects on water quality in the Mississippi Delta region.
Permanent Control Site: GP1 West Transect; Depth: 7.6 Meters (24.9 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP1 West Transect; Depth: 7.6 Meters (24.9 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.
Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.
Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.8 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.
Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.8 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.
Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.6 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.6 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Site: E2 East Transect; Depth: 14.7 Meters (48.2 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Video was not available in 2011 for this site pre-dam removal.
Permanent Site: E2 East Transect; Depth: 14.7 Meters (48.2 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Video was not available in 2011 for this site pre-dam removal.
Permanent Site: H2 East Transect; Depth: 7.9 Meters (26.0 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.
Permanent Site: H2 East Transect; Depth: 7.9 Meters (26.0 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.
Permanent Site: E2 West Transect; Depth: 15.0 Meters (49.1 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.
Permanent Site: E2 West Transect; Depth: 15.0 Meters (49.1 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.
Permanent Site: A2 East Transect; Depth: 12.9 Meters (Feet 42.4); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Annual seaweeds are present but very sparse.
Permanent Site: A2 East Transect; Depth: 12.9 Meters (Feet 42.4); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Annual seaweeds are present but very sparse.
Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.
Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.
Permanent Site: F2 West Transect; Depth: 11.6 Meters (38.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.
Permanent Site: F2 West Transect; Depth: 11.6 Meters (38.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.
Permanent Site: C1 East Transect; Depth: 8.8 Meters (Feet 28.8); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Brown seaweeds are absent and only a few small red seaweeds remain (1:13, 2:31 seconds).
Permanent Site: C1 East Transect; Depth: 8.8 Meters (Feet 28.8); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Brown seaweeds are absent and only a few small red seaweeds remain (1:13, 2:31 seconds).
Permanent Site: H1 East Transect; Depth: 5.6 Meters (Feet 18.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 East Transect; Depth: 5.6 Meters (Feet 18.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 West Transect; Depth: 5.0 Meters (Feet 16.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 West Transect; Depth: 5.0 Meters (Feet 16.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: F1 West Transect; Depth: 9.7 Meters (32 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This is a shallow site with gravel/cobble substrate and an occasional boulder.
Permanent Site: F1 West Transect; Depth: 9.7 Meters (32 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This is a shallow site with gravel/cobble substrate and an occasional boulder.