Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.4 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.
Videos
Explore a diverse collection of engaging videos showcasing the latest research, discoveries, and educational content from the U.S. Geological Survey. Dive into the fascinating world of geology, hydrology, ecology, and natural hazards as we bring science to life. Stay informed and inspired by our visual storytelling that highlights the vital work of USGS scientists and their impact on the planet.
Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.4 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.
Permanent Control Site: GP2 West Transect; Depth: 13.0 Meters (42.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.
Permanent Control Site: GP2 West Transect; Depth: 13.0 Meters (42.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.
China's Economic Rebalancing Act-Implications for the World Economy
China's Economic Rebalancing Act-Implications for the World EconomyChina’s economy is one of the largest in the world, and its appetite for mineral consumption is well-known. It’s one of the few countries whose domestic supply or and demand for a variety of mineral commodities affects the world market.
China's Economic Rebalancing Act-Implications for the World Economy
China's Economic Rebalancing Act-Implications for the World EconomyChina’s economy is one of the largest in the world, and its appetite for mineral consumption is well-known. It’s one of the few countries whose domestic supply or and demand for a variety of mineral commodities affects the world market.
The USGS and its cooperators have installed debris-flow monitoring equipment in the largest drainage basin at Chalk Cliffs, CO. Data collection at this site supports research on the hydrologic factors that control debris-flow initiation, entrainment, and flow dynamics.
The USGS and its cooperators have installed debris-flow monitoring equipment in the largest drainage basin at Chalk Cliffs, CO. Data collection at this site supports research on the hydrologic factors that control debris-flow initiation, entrainment, and flow dynamics.
Aerial video of Kīlauea Volcano's summit lava lake
Aerial video of Kīlauea Volcano's summit lava lakeThis aerial video footage, filmed by USGS in late July 2016, features Kīlauea Volcano's summit vent within Halema‘uma‘u Crater.
Aerial video of Kīlauea Volcano's summit lava lake
Aerial video of Kīlauea Volcano's summit lava lakeThis aerial video footage, filmed by USGS in late July 2016, features Kīlauea Volcano's summit vent within Halema‘uma‘u Crater.
Permanent Site: H1 West Transect; Depth: 5.7 Meters (18.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 West Transect; Depth: 5.7 Meters (18.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: A2 West Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.
Permanent Site: A2 West Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.
Permanent Site: C2 West Transect; Depth: 16.5 Meters (54.2 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds).
Permanent Site: C2 West Transect; Depth: 16.5 Meters (54.2 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds).
Permanent Site: H1 East Transect; Depth: 5.7 Meters (18.8 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 East Transect; Depth: 5.7 Meters (18.8 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: C2 East Transect; Depth: 16.1 Meters (52.8 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent.
Permanent Site: C2 East Transect; Depth: 16.1 Meters (52.8 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent.
Permanent Site: H2 West Transect; Depth: 7.8 Meters (25.5 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.
Permanent Site: H2 West Transect; Depth: 7.8 Meters (25.5 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.
Permanent Site: L1 West Transect; Depth: 11.1 Meters (36.5 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:17 seconds).
Permanent Site: L1 West Transect; Depth: 11.1 Meters (36.5 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:17 seconds).
Permanent Site: A1 West Transect; Depth: 9.0 Meters (29.6 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds are common this year.
Permanent Site: A1 West Transect; Depth: 9.0 Meters (29.6 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds are common this year.
Permanent Site: H2 East Transect; Depth: 8.1 Meters (26.6 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.
Permanent Site: H2 East Transect; Depth: 8.1 Meters (26.6 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.
Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:26, seconds).
Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:26, seconds).
Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:12, 1:49 seconds).
Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:12, 1:49 seconds).
GeoGirls: Five days of discovery at Mount St. Helens
GeoGirls: Five days of discovery at Mount St. HelensTwenty middle-school girls from Washington and Oregon participated in the 2016 “GeoGirls” outdoor volcano science program at Mount St. Helens, jointly organized by the U.S. Geological Survey and the Mount St. Helens Institute.
GeoGirls: Five days of discovery at Mount St. Helens
GeoGirls: Five days of discovery at Mount St. HelensTwenty middle-school girls from Washington and Oregon participated in the 2016 “GeoGirls” outdoor volcano science program at Mount St. Helens, jointly organized by the U.S. Geological Survey and the Mount St. Helens Institute.
Video of ARIS Sonar imagery showing a female and two male shovelnose sturgeon over an egg deposition location recorded during controlled experiments to study spawning behavior.
Video of ARIS Sonar imagery showing a female and two male shovelnose sturgeon over an egg deposition location recorded during controlled experiments to study spawning behavior.
For more information on the movement of wild birds in Asia and how this relates to avian influenza viruses, see http://www.pwrc.usgs.gov/ai. The autumn migration routes of bar-headed geese captured before the 2008 breeding season at Qinghai Lake, China, were documented using satellite tracking data.
For more information on the movement of wild birds in Asia and how this relates to avian influenza viruses, see http://www.pwrc.usgs.gov/ai. The autumn migration routes of bar-headed geese captured before the 2008 breeding season at Qinghai Lake, China, were documented using satellite tracking data.
USGS Groundwater Monitoring Well Redevelopment Using Air Lift Method
USGS Groundwater Monitoring Well Redevelopment Using Air Lift MethodThis video documents a U.S. Geological Survey technical procedure for groundwater well redevelopment using the air lift method. Over time, groundwater wells may become partially or even fully blocked by accumulation of materials at the well screen or openings.
USGS Groundwater Monitoring Well Redevelopment Using Air Lift Method
USGS Groundwater Monitoring Well Redevelopment Using Air Lift MethodThis video documents a U.S. Geological Survey technical procedure for groundwater well redevelopment using the air lift method. Over time, groundwater wells may become partially or even fully blocked by accumulation of materials at the well screen or openings.
Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent.
Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent.