Skip to main content
U.S. flag

An official website of the United States government

Videos

See our science in action.

Filter Total Items: 550
D2 West Transect – 2016
D2 West Transect – 2016
D2 West Transect – 2016

Permanent Site: D2 West Transect; Depth: 12.8 Meters (41.9 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 5 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some cobble.

Permanent Site: D2 West Transect; Depth: 12.8 Meters (41.9 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 5 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some cobble.

GP1 East Transect – 2016
GP1 East Transect – 2016
GP1 East Transect – 2016

Permanent Control Site: GP1 East Transect; Depth: 7.5 m (24.7 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long:; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.5 m (24.7 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long:; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP1 West Transect – 2016
GP1 West Transect – 2016
GP1 West Transect – 2016

Permanent Control Site: GP1 West Transect; Depth: 7.9 m (25.9 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 7.9 m (25.9 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Golden Eagle Flight
Golden Eagle Flight
Golden Eagle Flight

Golden eagles can be killed by colliding with a number of human-made objects, including wind turbines. USGS research wildlife biologist Todd Katzner describes his studies of golden eagle flight. This research is being done to model flight behavior which might help managers understand how placement of wind turbines might pose significant risks to golden eagles.

Golden eagles can be killed by colliding with a number of human-made objects, including wind turbines. USGS research wildlife biologist Todd Katzner describes his studies of golden eagle flight. This research is being done to model flight behavior which might help managers understand how placement of wind turbines might pose significant risks to golden eagles.

GP2 East Transect – 2016
GP2 East Transect – 2016
GP2 East Transect – 2016

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.4 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.4 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

GP2 West Transect – 2015
GP2 West Transect – 2015
GP2 West Transect – 2015

Permanent Control Site: GP2 West Transect; Depth: 13.0 Meters (42.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 13.0 Meters (42.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

H1 West Transect – 2016
H1 West Transect – 2016
H1 West Transect – 2016

Permanent Site: H1 West Transect; Depth: 5.7 Meters (18.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.7 Meters (18.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

C2 West Transect – 2016
C2 West Transect – 2016
C2 West Transect – 2016

Permanent Site: C2 West Transect; Depth: 16.5 Meters (54.2 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds).

Permanent Site: C2 West Transect; Depth: 16.5 Meters (54.2 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds).

H1 East Transect – 2016
H1 East Transect – 2016
H1 East Transect – 2016

Permanent Site: H1 East Transect; Depth: 5.7 Meters (18.8 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.7 Meters (18.8 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

A2 West Transect – 2016
A2 West Transect – 2016
A2 West Transect – 2016

Permanent Site: A2 West Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

Permanent Site: A2 West Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

L1 West Transect – 2016
L1 West Transect – 2016
L1 West Transect – 2016

Permanent Site: L1 West Transect; Depth: 11.1 Meters (36.5 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:17 seconds).

Permanent Site: L1 West Transect; Depth: 11.1 Meters (36.5 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:17 seconds).

C2 East Transect – 2016
C2 East Transect – 2016
C2 East Transect – 2016

Permanent Site: C2 East Transect; Depth: 16.1 Meters (52.8 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent.

Permanent Site: C2 East Transect; Depth: 16.1 Meters (52.8 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent.

H2 West Transect – 2016
H2 West Transect – 2016
H2 West Transect – 2016

Permanent Site: H2 West Transect; Depth: 7.8 Meters (25.5 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

Permanent Site: H2 West Transect; Depth: 7.8 Meters (25.5 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

A1 West Transect – 2016
A1 West Transect – 2016
A1 West Transect – 2016

Permanent Site: A1 West Transect; Depth: 9.0 Meters (29.6 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds are common this year.

Permanent Site: A1 West Transect; Depth: 9.0 Meters (29.6 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds are common this year.

H2 East Transect – 2016
H2 East Transect – 2016
H2 East Transect – 2016

Permanent Site: H2 East Transect; Depth: 8.1 Meters (26.6 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

Permanent Site: H2 East Transect; Depth: 8.1 Meters (26.6 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

A1 East Transect – 2016

Permanent Site: A1 East Transect; Depth: 8.0 Meters (26.1 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to be buried.

Permanent Site: A1 East Transect; Depth: 8.0 Meters (26.1 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to be buried.

4SP1 East Transect – 2016
4SP1 East Transect – 2016
4SP1 East Transect – 2016

Permanent Site: 4SP1 - East Transect; Depth: 5.2 Meters (17.0 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

Permanent Site: 4SP1 - East Transect; Depth: 5.2 Meters (17.0 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

4SP1 West Transect – 2016
4SP1 West Transect – 2016
4SP1 West Transect – 2016

Permanent Site: 4SP1 - West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

Permanent Site: 4SP1 - West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

C1 West Transect – 2016
C1 West Transect – 2016
C1 West Transect – 2016

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:12, 1:49 seconds).

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:12, 1:49 seconds).

C1 East Transect – 2016
C1 East Transect – 2016
C1 East Transect – 2016

Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:26, seconds).

Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:26, seconds).

Shovelnose Spawning
Shovelnose Spawning
Shovelnose Spawning

Video of ARIS Sonar imagery showing a female and two male shovelnose sturgeon over an egg deposition location recorded during controlled experiments to study spawning behavior.
 

Video of ARIS Sonar imagery showing a female and two male shovelnose sturgeon over an egg deposition location recorded during controlled experiments to study spawning behavior.
 

Was this page helpful?