The Science of Good Taste -- Geology, Wine and Food
The Science of Good Taste -- Geology, Wine and FoodNovember public lecture, "The Science of Good Taste -- Geology, Wine and Food"presented by Larry Meinert, Ph.D.
An official website of the United States government
Here's how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
See our science in action.
several bunches of grapes, mostly purple but a few green, hang from a grapevine
November public lecture, "The Science of Good Taste -- Geology, Wine and Food"presented by Larry Meinert, Ph.D.
November public lecture, "The Science of Good Taste -- Geology, Wine and Food"presented by Larry Meinert, Ph.D.
This clip shows a bat (not identified to species) flying near a turbine as imaged with a thermal camera. The recording shows the bat making numerous repeated passes behind the rotor swept area of a turbine. This activity is of particular interest to researchers because it provides a window into behavior that places bats at risk from turbine strikes.
This clip shows a bat (not identified to species) flying near a turbine as imaged with a thermal camera. The recording shows the bat making numerous repeated passes behind the rotor swept area of a turbine. This activity is of particular interest to researchers because it provides a window into behavior that places bats at risk from turbine strikes.
Aaron Cupp is a student who has worked with the USGS for four years in La Crosse at the Upper Midwest Environmental Sciences Center. As a graduate student through UW Stevens Point, he has worked in Aquaculture Drug Research under Mark Gaikowski.
Aaron Cupp is a student who has worked with the USGS for four years in La Crosse at the Upper Midwest Environmental Sciences Center. As a graduate student through UW Stevens Point, he has worked in Aquaculture Drug Research under Mark Gaikowski.
Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.6 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.6 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
Permanent Site: K1 West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t
Permanent Site: K1 West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t
Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.
Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.
Permanent Site: K1 East Transect; Depth: 6.5 Meters (21.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive th
Permanent Site: K1 East Transect; Depth: 6.5 Meters (21.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive th
Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.
Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.
video thumbnail: Return of the Gentle Giants: Huron-Erie Corridor Fish Habitat Restoration
The St. Clair River, Lake St. Clair and the Detroit River, also known as the Huron-Erie Corridor, are the international waters that connect Lake Huron to Lake Erie. Environmental changes in the Corridor over time have resulted in a loss of habitat for fish and other organisms. This video is focusing on the successful St.
The St. Clair River, Lake St. Clair and the Detroit River, also known as the Huron-Erie Corridor, are the international waters that connect Lake Huron to Lake Erie. Environmental changes in the Corridor over time have resulted in a loss of habitat for fish and other organisms. This video is focusing on the successful St.
Permanent Site: 4SP1 - West Transect; Depth: 6.3 Meters (20.8 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 11 months post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: Substrate has remained the same (gravel/cobble) but site is largely devoid of all annual species of seaweeds.
Permanent Site: 4SP1 - West Transect; Depth: 6.3 Meters (20.8 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 11 months post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: Substrate has remained the same (gravel/cobble) but site is largely devoid of all annual species of seaweeds.
Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t
Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t
Permanent Site: J1 West Transect; Depth: 9.1 Meters (29.9 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
Permanent Site: J1 West Transect; Depth: 9.1 Meters (29.9 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than
This clip shows a bat (not identified to species) flying near a turbine as imaged with a camera sensitive to near infrared light. The bat flies in rapidly from the top left, then turns and flies into the spinning rotor blades of the turbine. The bat appears to be deflected upwards by the blades and escapes a direct strike.
This clip shows a bat (not identified to species) flying near a turbine as imaged with a camera sensitive to near infrared light. The bat flies in rapidly from the top left, then turns and flies into the spinning rotor blades of the turbine. The bat appears to be deflected upwards by the blades and escapes a direct strike.
Heather Welch, Claire Rose, and Richard Coupe, U.S. Geological Survey scientists involved in the National Water Quality Assessment (NAWQA) Study of Agricultural Chemical Transport (ACT) study, outline agricultural effects on water quality in the Mississippi Delta region.
Heather Welch, Claire Rose, and Richard Coupe, U.S. Geological Survey scientists involved in the National Water Quality Assessment (NAWQA) Study of Agricultural Chemical Transport (ACT) study, outline agricultural effects on water quality in the Mississippi Delta region.
Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.
Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.
Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.8 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.
Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.8 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.
Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.6 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.6 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP1 West Transect; Depth: 7.6 Meters (24.9 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP1 West Transect; Depth: 7.6 Meters (24.9 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Site: E2 West Transect; Depth: 15.0 Meters (49.1 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.
Permanent Site: E2 West Transect; Depth: 15.0 Meters (49.1 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.
Permanent Site: H2 East Transect; Depth: 7.9 Meters (26.0 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.
Permanent Site: H2 East Transect; Depth: 7.9 Meters (26.0 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.