Skip to main content
U.S. flag

An official website of the United States government

Videos

Videos intro.
Filter Total Items: 338
Volcano Web Shorts 6: Societal Impacts of Volcanism
Volcano Web Shorts 6: Societal Impacts of Volcanism
Volcano Web Shorts 6: Societal Impacts of Volcanism

USGS geologist, Angie Diefenbach, describes how she uses GIS, (Geographic Information Systems) software to study volcanic eruptions and their impacts on society.

USGS geologist, Angie Diefenbach, describes how she uses GIS, (Geographic Information Systems) software to study volcanic eruptions and their impacts on society.

Time-series of dome & glacier growth at Mount St. Helens, WA
Time-series of dome & glacier growth at Mount St. Helens, WA
Time-series of dome & glacier growth at Mount St. Helens, WA

The video shows time-lapse changes in the lava dome and Crater Glacier from 2004-2012. The images were created from 1:12,000 scale vertical aerial photographs combined with ground control points from campaign GPS and targets. Photogrammetry software was used to collect a 3-D point cloud and combined to make a digital elevation model (DEM).

The video shows time-lapse changes in the lava dome and Crater Glacier from 2004-2012. The images were created from 1:12,000 scale vertical aerial photographs combined with ground control points from campaign GPS and targets. Photogrammetry software was used to collect a 3-D point cloud and combined to make a digital elevation model (DEM).

D1 East Transect – 2011
D1 East Transect – 2011
D1 East Transect – 2011

Permanent Site: D1 East Transect; Depth: 9.4 Meters (30.9 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15115998,-123.56734404; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.

Permanent Site: D1 East Transect; Depth: 9.4 Meters (30.9 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15115998,-123.56734404; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.

D1 West Transect – 2011
D1 West Transect – 2011
D1 West Transect – 2011

Permanent Site: D1 West Transect; Depth: 10.3 Meters (33.8 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15115998,-123.56801602; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweed is abundant.

Permanent Site: D1 West Transect; Depth: 10.3 Meters (33.8 Feet); Distance from river mouth: 0.2 Kilometers (0.1 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15115998,-123.56801602; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweed is abundant.

4SP1 East Transect – 2011
4SP1 East Transect – 2011
4SP1 East Transect – 2011

Permanent Site: 4SP1 - East Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: Predominantly a high current site with gravel/cobble substrate covered in seaweeds.

Permanent Site: 4SP1 - East Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: Predominantly a high current site with gravel/cobble substrate covered in seaweeds.

C2 East Transect – 2011
C2 East Transect – 2011
C2 East Transect – 2011

Permanent Site: C2 East Transect; Depth: 16.5 Meters (Feet 54); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Mainly sand with small amounts of gravel.

Permanent Site: C2 East Transect; Depth: 16.5 Meters (Feet 54); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Mainly sand with small amounts of gravel.

C2 West Transect – 2011
C2 West Transect – 2011
C2 West Transect – 2011

Permanent Site: C2 West Transect; Depth: 16.8 Meters (Feet 55.2); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: Mainly sand with small amounts of gravel. One of our deepest sites. Mainly sand with small amounts of gravel.

Permanent Site: C2 West Transect; Depth: 16.8 Meters (Feet 55.2); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: Mainly sand with small amounts of gravel. One of our deepest sites. Mainly sand with small amounts of gravel.

H1 West Transect – 2011
H1 West Transect – 2011
H1 West Transect – 2011

Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

D2 West Transect – 2011
D2 West Transect – 2011
D2 West Transect – 2011

Permanent Site: D2 West Transect; Depth: 12.6 Meters (41.3 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweed is abundant.

Permanent Site: D2 West Transect; Depth: 12.6 Meters (41.3 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweed is abundant.

D2 East Transect – 2011
D2 East Transect – 2011
D2 East Transect – 2011

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.8 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweed is abundant.

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.8 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweed is abundant.

GP2 East Transect – 2011
GP2 East Transect – 2011
GP2 East Transect – 2011

Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

GP1 East Transect – 2011
GP1 East Transect – 2011
GP1 East Transect – 2011

Permanent Control Site: GP1 East Transect; Depth: 7.4 Meters (24.2 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.4 Meters (24.2 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 West Transect – 2011
GP2 West Transect – 2011
GP2 West Transect – 2011

Permanent Control Site: GP2 West Transect; Depth: 13.1 Meters (43 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control.

Permanent Control Site: GP2 West Transect; Depth: 13.1 Meters (43 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control.

GP1 West Transect — 2011
GP1 West Transect — 2011
GP1 West Transect — 2011

Permanent Control Site: GP1 West Transect; Depth: 7.8 Meters (25.7 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 7.8 Meters (25.7 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

H1 East Transect – 2011
H1 East Transect – 2011
H1 East Transect – 2011

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.0); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.0); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

C1 West Transect – 2011
C1 West Transect – 2011
C1 West Transect – 2011

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is clean sand with scatterings of gravel.

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is clean sand with scatterings of gravel.

C1 East Transect – 2011
C1 East Transect – 2011
C1 East Transect – 2011

Permanent Site: C1 East Transect; Depth: 9.6 Meters (Feet 31.4); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is clean sand with minimal gravel. Algae is absent on first third of transect.

Permanent Site: C1 East Transect; Depth: 9.6 Meters (Feet 31.4); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is clean sand with minimal gravel. Algae is absent on first third of transect.

E2 West Transect – 2011
E2 West Transect – 2011
E2 West Transect – 2011

Permanent Site: E2 West Transect; Depth: 14.8 Meters (48.7 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders (0:25, 0:34, 0:43seconds).

Permanent Site: E2 West Transect; Depth: 14.8 Meters (48.7 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders (0:25, 0:34, 0:43seconds).

F1 East Transect – 2011
F1 East Transect – 2011
F1 East Transect – 2011

Permanent Site: F1 East Transect; Depth: 6.2 Meters (20.4 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: Video is blurry and of poor quality. This is a shallow site with gravel substrate.

Permanent Site: F1 East Transect; Depth: 6.2 Meters (20.4 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: Video is blurry and of poor quality. This is a shallow site with gravel substrate.

F1 West Transect – 2011
F1 West Transect – 2011
F1 West Transect – 2011

Permanent Site: F1 West Transect; Depth: 6.7 Meters (22 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This is a shallow site with gravel substrate.

Permanent Site: F1 West Transect; Depth: 6.7 Meters (22 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This is a shallow site with gravel substrate.

F2 East Transect – 2011
F2 East Transect – 2011
F2 East Transect – 2011

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

Was this page helpful?