The new Great Salt Lake breach was opened on Dec. 1 by the Union Pacific Railroad Company. This created a new opening between the north and the south arm of the lake, allowing water to flow between the two sides. This time-lapse video shows the breach opening, which took about two hours.
Videos
Videos intro.
The new Great Salt Lake breach was opened on Dec. 1 by the Union Pacific Railroad Company. This created a new opening between the north and the south arm of the lake, allowing water to flow between the two sides. This time-lapse video shows the breach opening, which took about two hours.
John Wesley Powell, Canyon Geologist