Skip to main content
U.S. flag

An official website of the United States government

Videos

Videos

Filter Total Items: 1158
Redington Stream Flow
Redington Stream Flow
Redington Stream Flow

This video shows the process of taking a stream flow measurement using a bridge crane and current meter.

This video shows the process of taking a stream flow measurement using a bridge crane and current meter.

RM Files Management Training 2014
RM Files Management Training 2014
RM Files Management Training 2014

RM Files Management Training 2014 - webex converted to mp4 for training purposes

Basic Records Management Training 2014
Basic Records Management Training 2014
Basic Records Management Training 2014

Basic Records Management Training 2014 - webex converted to mp4 for training purposes

Records Management Disposition Training 2014
Records Management Disposition Training 2014
Records Management Disposition Training 2014

Records Management Disposition Training 2014 - webex converted to mp4 for training purposes

J1 East Transect – 2014
J1 East Transect – 2014
J1 East Transect – 2014

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates is mainly a gravel/sand mixture. Seaweed density is still greatly decreased.

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates is mainly a gravel/sand mixture. Seaweed density is still greatly decreased.

E2 West Transect – 2014
E2 West Transect – 2014
E2 West Transect – 2014

Permanent Site: E2 West Transect; Depth: 14.6 Meters (48 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders. Seaweed is absent.

Permanent Site: E2 West Transect; Depth: 14.6 Meters (48 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders. Seaweed is absent.

E2 East Transect – 2014
E2 East Transect – 2014
E2 East Transect – 2014

Permanent Site: E2 East Transect; Depth: 14.8 Meters (48.5 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder. Seaweed is absent.

Permanent Site: E2 East Transect; Depth: 14.8 Meters (48.5 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder. Seaweed is absent.

K1 West Transect – 2014
K1 West Transect – 2014
K1 West Transect – 2014

Permanent Site: K1 West Transect; Depth: 6.1 Meters (20.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

Permanent Site: K1 West Transect; Depth: 6.1 Meters (20.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

F1 East Transect – 2014
F1 East Transect – 2014
F1 East Transect – 2014

Permanent Site: F1 East Transect; Depth: 6.6 Meters (21.5 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site that is actively being buried. Substrate has converted from gravel/cobble to all sand.

Permanent Site: F1 East Transect; Depth: 6.6 Meters (21.5 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site that is actively being buried. Substrate has converted from gravel/cobble to all sand.

F1 West Transect – 2014
F1 West Transect – 2014
F1 West Transect – 2014

Permanent Site: F1 West Transect; Depth: 6.6 Meters (21.6 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This video is a good example of a site that is actively being covered in sandy sediment from the dam removals.

Permanent Site: F1 West Transect; Depth: 6.6 Meters (21.6 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: This video is a good example of a site that is actively being covered in sandy sediment from the dam removals.

GP2 East Transect – 2014
GP2 East Transect – 2014
GP2 East Transect – 2014

Permanent Control Site: GP2 East Transect; Depth: 13.5 Meters (44.4 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 13.5 Meters (44.4 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

GP1 East Transect – 2014
GP1 East Transect – 2014
GP1 East Transect – 2014

Permanent Control Site: GP1 East Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP1 West Transect – 2014
GP1 West Transect – 2014
GP1 West Transect – 2014

Permanent Control Site: GP1 West Transect; Depth: 7.4 Meters (24.2 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 7.4 Meters (24.2 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 West Transect – 2014
GP2 West Transect – 2014
GP2 West Transect – 2014

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Debris Flow Monitoring at Chalk Cliffs, CO (2014)
Debris Flow Monitoring at Chalk Cliffs, CO (2014)
Debris Flow Monitoring at Chalk Cliffs, CO (2014)

The USGS and its cooperators have installed debris-flow monitoring equipment in the largest drainage basin at Chalk Cliffs, CO. Data collection at this site supports research on the hydrologic factors that control debris-flow initiation, entrainment, and flow dynamics.

The USGS and its cooperators have installed debris-flow monitoring equipment in the largest drainage basin at Chalk Cliffs, CO. Data collection at this site supports research on the hydrologic factors that control debris-flow initiation, entrainment, and flow dynamics.

PubTalk 7/2014 — The Ecological Value of Coastal Fog
PubTalk 7/2014 — The Ecological Value of Coastal Fog
C2 East Transect – 2014
C2 East Transect – 2014
C2 East Transect – 2014

Permanent Site: C2 East Transect; Depth: 16.3 Meters (Feet 53.6); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is seen (0:05 0:28, 1:52 seconds).

Permanent Site: C2 East Transect; Depth: 16.3 Meters (Feet 53.6); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is seen (0:05 0:28, 1:52 seconds).

C1 West Transect – 2014
C1 West Transect – 2014
C1 West Transect – 2014

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Fragments of drift seaweed and eelgrass are seen throughout entire video.

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Fragments of drift seaweed and eelgrass are seen throughout entire video.

C1 East Transect – 2014
C1 East Transect – 2014
C1 East Transect – 2014

Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Fragments of drift seaweed and eelgrass are seen throughout entire video.

Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Fragments of drift seaweed and eelgrass are seen throughout entire video.

H1 West Transect – 2014
H1 West Transect – 2014
H1 West Transect – 2014

Permanent Site: H1 West Transect; Depth: 5.7 Meters (Feet 18.7); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.7 Meters (Feet 18.7); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

C2 West Transect – 2014
C2 West Transect – 2014
C2 West Transect – 2014

Permanent Site: C2 West Transect; Depth: 16.8 Meters (Feet 55.2); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Lots of woody debris is present (0:28, 1:52 seconds).

Permanent Site: C2 West Transect; Depth: 16.8 Meters (Feet 55.2); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Lots of woody debris is present (0:28, 1:52 seconds).

Was this page helpful?