Western Fisheries Research Center

Multimedia

Filter Total Items: 346
August 15, 2017

C2 West Transect – 2017

Permanent Site: C2 West Transect; Depth: 15.3 Meters (50.3 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds). The featherduster tubeworms that were

August 15, 2017

4SP1 East Transect – 2017

Permanent Site: 4SP1 - East Transect; Depth: 5.5 Meters (18.1 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Since 2013, seaweed has been completely absent. However, this year three species

August 15, 2017

4SP1 West Transect – 2017

Permanent Site: 4SP1 - West Transect; Depth: 6.2 Meters (20.2 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: This site has converted from gravel/cobble substrate to all sand. Since 2013, seaweed has been completely absent. However, this year six species of

August 14, 2017

GP2 East Transect – 2017

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand mixture. A few large boulders are located off

August 14, 2017

GP2 West Transect – 2017

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders. This year red

August 3, 2017

A2 West Transect – 2017

Permanent Site: A2 West Transect; Depth: 12.8 Meters (42.0 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders. Seven species of seaweeds are present though not

August 3, 2017

C1 East Transect – 2017

Permanent Site: C1 East Transect; Depth: 8.5 Meters (28.0 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Current was high and contained lots of drift seaweed and eelgrass (0:05 seconds). In 2016 all seaweeds were absent but this

August 3, 2017

C1 West Transect – 2017

Permanent Site: C1 West Transect; Depth: 9.3 Meters (30.4 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. Current was high and contained lots of drift seaweed and eelgrass (0:04, 0:38 seconds). Though seaweeds were absent in 2016

August 3, 2017

A2 East Transect – 2017

Permanent Site: A2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Five species of seaweeds are present though not abundant. The two most

August 2, 2017

H2 East Transect – 2017

Permanent Site: H2 East Transect; Depth: 7.6 Meters (24.8 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth. Substrate is mainly gravel with some sand, cobble and an occasional boulder and has not changed since dam

August 2, 2017

H2 West Transect – 2017

Permanent Site: H2 West Transect; Depth: 7.3 Meters (23.8 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth. Substrate is mainly gravel with some sand, cobble and an occasional boulder and has not changed since dam

August 2, 2017

A1 East Transect – 2017

Permanent Site: A1 East Transect; Depth: 7.7 Meters (25.4 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to still be buried. The sand on