Western Fisheries Research Center

Multimedia

Filter Total Items: 350
August 15, 2017

C2 West Transect – 2017

Permanent Site: C2 West Transect; Depth: 15.3 Meters (50.3 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds). The featherduster tubeworms that were

...
August 15, 2017

4SP1 East Transect – 2017

Permanent Site: 4SP1 - East Transect; Depth: 5.5 Meters (18.1 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Since 2013, seaweed has been completely absent. However, this year three species

...
August 15, 2017

4SP1 West Transect – 2017

Permanent Site: 4SP1 - West Transect; Depth: 6.2 Meters (20.2 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: This site has converted from gravel/cobble substrate to all sand. Since 2013, seaweed has been completely absent. However, this year six species of

...
August 14, 2017

GP2 East Transect – 2017

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand mixture. A few large boulders are located off

...
August 14, 2017

GP2 West Transect – 2017

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders. This year red

...
August 3, 2017

A2 East Transect – 2017

Permanent Site: A2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Five species of seaweeds are present though not abundant. The two most

...
August 3, 2017

A2 West Transect – 2017

Permanent Site: A2 West Transect; Depth: 12.8 Meters (42.0 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders. Seven species of seaweeds are present though not

...
August 3, 2017

C1 East Transect – 2017

Permanent Site: C1 East Transect; Depth: 8.5 Meters (28.0 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Current was high and contained lots of drift seaweed and eelgrass (0:05 seconds). In 2016 all seaweeds were absent but this

...
August 3, 2017

C1 West Transect – 2017

Permanent Site: C1 West Transect; Depth: 9.3 Meters (30.4 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. Current was high and contained lots of drift seaweed and eelgrass (0:04, 0:38 seconds). Though seaweeds were absent in 2016

...
August 2, 2017

A1 East Transect – 2017

Permanent Site: A1 East Transect; Depth: 7.7 Meters (25.4 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to still be buried. The sand on

...
August 2, 2017

A1 West Transect – 2017

Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.7 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. The sandy areas on the entire transect

...
August 2, 2017

H2 East Transect – 2017

Permanent Site: H2 East Transect; Depth: 7.6 Meters (24.8 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth. Substrate is mainly gravel with some sand, cobble and an occasional boulder and has not changed since dam

...