Western Fisheries Research Center

Multimedia

Filter Total Items: 362
August 21, 2011

4SP1 East Transect – 2011

Permanent Site: 4SP1 - East Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: Predominantly a high current site with gravel/cobble substrate covered in seaweeds. The tall, stalked seaweed seen in the video is the perennial

August 20, 2011

C2 East Transect – 2011

Permanent Site: C2 East Transect; Depth: 16.5 Meters (Feet 54); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Mainly sand with small amounts of gravel. Numerous species of seaweeds are present throughout entire transect but growth is

August 20, 2011

C2 West Transect – 2011

Permanent Site: C2 West Transect; Depth: 16.8 Meters (Feet 55.2); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: Mainly sand with small amounts of gravel. One of our deepest sites. Mainly sand with small amounts of gravel. Red and brown seaweeds are abundant but grow

August 19, 2011

D2 East Transect – 2011

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.8 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweed is abundant. Bull kelp Nereocystis luetkeana (1:26, 1:

August 19, 2011

H1 West Transect – 2011

Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.4); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites. Substrate is mainly

August 19, 2011

D2 West Transect – 2011

Permanent Site: D2 West Transect; Depth: 12.6 Meters (41.3 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand. Seaweed is abundant. Bull kelp Nereocystis luetkeana (0:10, 1:

August 18, 2011

GP2 East Transect – 2011

Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture. A few large boulders are located off

August 18, 2011

GP1 West Transect — 2011

Permanent Control Site: GP1 West Transect; Depth: 7.8 Meters (25.7 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow. Substrate is mainly a gravel/sand/cobble mixture surrounding

August 18, 2011

GP2 West Transect – 2011

Permanent Control Site: GP2 West Transect; Depth: 13.1 Meters (43 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders (1:05 seconds).

August 18, 2011

GP1 East Transect – 2011

Permanent Control Site: GP1 East Transect; Depth: 7.4 Meters (24.2 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow. Substrate is mainly a gravel/sand/cobble mixture surrounding

August 8, 2011

H1 East Transect – 2011

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.0); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites. Substrate is mainly

August 8, 2011

C1 West Transect – 2011

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 1 month pre-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is clean sand with scatterings of gravel. Patches of brown seaweed, mainly Alaria marginata (0:19 seconds) and Saccharina spp., and red algae (0:13